Another new case study is now available on our website – this time, we look at the regeneration of roads and paving through the centre of Ripon.
The roads and paving running through Ripon Market Place had ongoing issues with surface course deterioration, with parts of the surface beginning to sink and the block paving failing, posing a potential safety risk. In addition, drainage systems and stone sets in loading bays had been damaged by previous contractors.
Read more about how NY Highways completed a high-quality programme of resurfacing and repair works ahead of schedule: